Fiber optic installation, splicing and OTDR testing

Fiber crews for single-strand fixes through campus and rural broadband builds. Every link is tested and certified before we close the ticket, and you get the test files.

Updated October 2026

Request a quote or call 813.517.9479

What's included

  • Single-mode and multimode installs
  • Fusion splicing and termination
  • Tier 1 certification: light-loss (OLTS) testing per link
  • Tier 2 certification: OTDR traces for every strand, with event tables
  • Certification reports and as-builts delivered at closeout
  • Outside plant and aerial or underground pulls
  • Rural and tribal broadband builds as a subcontractor

What you get at closeout

  • Light-loss (OLTS) results for every link
  • OTDR traces and event tables for every strand
  • Labeled fiber map and as-built drawings
  • Photos of enclosures, panels and splice trays
  • Test files in the tester's native format, plus PDF

Standards and credentials

Installed and tested to BICSI practices, ANSI/TIA-568 and TIA-526 test methods, and the electrical codes your state and city have adopted.

Technician credentials

  • BICSI Installer and Technician
  • FOA Certified Fiber Optic Technician (CFOT)
  • Manufacturer-certified installers for warrantied systems

How the work runs

  1. Scope

    You send the sites, the work and the window. We confirm the scope of work, materials and pricing in writing.

  2. Match

    We assign a technician with the right skills near each site and share their name before the visit.

  3. On site

    The technician checks in, does the work, and calls before doing anything outside the agreed scope.

  4. Closeout

    You get the deliverables listed above for every visit, ready for your ticket or work order.

Where we do this work

All 50 states and DC, as a single dispatch, a project or a rollout across many locations. Industries we do this for most often:

Related services

Questions about fiber installation and termination

What's the difference between Tier 1 and Tier 2 fiber testing?

Tier 1 measures the total light loss on each link with an optical loss test set and checks it against the loss budget. Tier 2 adds an OTDR trace that shows where every connector, splice and bend sits along the strand and how much loss each one adds.

Do you work on single-mode and multimode fiber?

Yes, both, from backbone and campus links to building risers and data center trunks.

Do you handle outside plant work?

Yes. Aerial, underground and conduit pulls as part of campus and broadband builds, usually as a subcontractor to the prime contractor or carrier.

Which standards do you follow?

TIA-568 and TIA-526 test methods, BICSI installation practices, and the electrical codes adopted by your state and city.

Get a quote for fiber installation and termination

Send the scope, locations and timing. We reply within one business day with pricing or a few questions.

Request a quote

Prefer to talk? Call 813.517.9479.